[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"mm-article:opere-incompiute:en:live":3},{"slug":4,"date":5,"theme":6,"featured":7,"title":8,"abstract":9,"cover":10,"coverAlt":11,"infographic":12,"infographicAlt":13,"infographicLarge":14,"infographicCount":15,"blocks":16,"metaDescription":237,"infographicFull":238,"infographics":239,"seo":242,"language":243,"unpublished":7,"related":244},"opere-incompiute","2025-05-05","governance-regole-mercato",false,"Unfinished projects in Italy: delays, costs and missed funding","Italy continues to face the problem of unfinished public works, a phenomenon that negatively affects infrastructure efficiency and development. The analysis explores the evolution of the phenomenon, the main causes of blockages and some emblematic cases in the public transport sector. Despite periodic monitoring and strategies put in place to reduce the phenomenon, new critical issues and blocked construction sites are recorded every year. The update of the Registry of Unfinished Works, a MIMS monitoring system, reveals worrying data: there are still numerous unfinished works and the costs for their completion continue to rise.","\u002Fapi\u002Fassets\u002F0dec5f20-d086-4588-97b5-96afaace9db9?width=800&format=webp","Cover: unfinished public works in Italy; lack of funding causes 40% of cases and technical problems 30%, with 443 projects stalled in 2020 worth €2.8 billion","\u002Fapi\u002Fassets\u002F5f8d3cda-9662-49d8-b5bb-ed0fd49dc541?width=500&format=webp","Infographic with map: unfinished works by region, Sicily leading with 138; down from 443 (2020) to 373 (2022), worth €2.5bn; main causes lack of funding (40%) and technical problems (30%)","\u002Fapi\u002Fassets\u002F5f8d3cda-9662-49d8-b5bb-ed0fd49dc541?width=1000&format=webp",1,[17,20,22,26,28,30,32,34,36,44,46,54,56,58,64,66,68,70],{"type":18,"html":19},"paragraph","\u003Cp>Despite periodic monitoring and strategies put in place to reduce the phenomenon, new critical issues and blocked construction sites are recorded every year. The update of the Registry of Unfinished Works, a MIMS monitoring system, reveals worrying data: there are still numerous unfinished works and the costs for their completion continue to rise.\u003C\u002Fp>\n",{"type":18,"html":21},"\u003Cp>\u003Cem>Non-downloadable image, to receive it please contact us at metrics@basco-t.com\u003C\u002Fem>\u003C\u002Fp>\n",{"type":23,"level":24,"text":25},"heading",2,"The numbers of unfinished works",{"type":18,"html":27},"\u003Cp>Analysing the trend in recent years, it can be seen that in 2021 there were 377 unfinished works, a slight decrease compared to 2020, when the number stood at 443. According to the latest report, updated to 31 December 2022, the total number of unfinished works is 373, only 4 fewer than the previous year.\u003C\u002Fp>\n",{"type":18,"html":29},"\u003Cp>The total amount of the interventions, updated to the latest economic framework, decreased drastically between 2020 and 2021, from EUR 2.8 billion to EUR 1.8 billion (-35.7%), reaching EUR 2.5 billion in 2022.\u003C\u002Fp>\n",{"type":23,"level":24,"text":31},"Most affected regions and causes of work stoppages",{"type":18,"html":33},"\u003Cp>The territorial analysis shows significant differences between regions. Sicily holds the negative record with 138 unfinished works in 2022.\u003C\u002Fp>\n",{"type":18,"html":35},"\u003Cp>Among the most problematic regions we find:\u003C\u002Fp>\n",{"type":37,"ordered":7,"icon":38,"items":39},"list",null,[40,41,42,43],"\u003Cstrong>Sardinia\u003C\u002Fstrong>43 works worth over 241 million euros.","\u003Cstrong>Lazio\u003C\u002Fstrong>26 unfinished works, with a total amount needed of more than 370 million euro and 17 million for the completion of works.","\u003Cstrong>Calabria\u003C\u002Fstrong>20 unfinished works with a total amount needed of more than 50 million euro and approximately 30 million in charges for completion of works.","\u003Cstrong>Campania\u003C\u002Fstrong>: 17 unfinished works with over 50 million euro required for completion.",{"type":18,"html":45},"\u003Cp>Since 2021, the Anagrafe monitoring has introduced a classification of the causes that lead to the blockage of public works. The data reveal that:\u003C\u002Fp>\n",{"type":37,"ordered":7,"icon":38,"items":47},[48,49,50,51,52,53],"40% of works are blocked due to lack of funds","30% are blocked due to technical problems, often resulting from design errors or regulations that have arisen","18% are stopped due to the bankruptcy, withdrawal or contract termination of the contractor","6% were stopped due to the introduction of new regulations or legal provisions","4% remained unfinished due to lack of interest in completion, especially in the case of obsolete or outdated works","2% were stopped by several concomitant causes, making it even more difficult to resume work",{"type":23,"level":24,"text":55},"Unfinished projects and public transport: emblematic cases",{"type":18,"html":57},"\u003Cp>The \u003Cstrong>\u003Ca href=\"https:\u002F\u002Fwww.legambiente.it\u002Fwp-content\u002Fuploads\u002F2024\u002F12\u002FPendolaria-2025.pdf\">Pendolaria 2025 report\u003C\u002Fa>\u003C\u002Fstrong> highlights numerous unfinished or stalled public transport infrastructures. Some examples:\u003C\u002Fp>\n",{"type":37,"ordered":7,"icon":38,"items":59},[60,61,62,63],"Rome and the railway ring: the closure of the capital's railway ring was cut €175 million from the PNRR funds in 2023. Without the completion of the entire project, the ongoing work between Valle Aurelia and Vigna Clara, scheduled for 2026, risks proving of little use for improving urban rail services.","The Termini-Vaticano-Aurelio tramway (TVA,Rome): project postponed to 2026 due to controversy over urban impact.","The case of the Trieste cableway: a 48.7 million euro project for a 4.2 km long cableway, strongly contested by environmental associations and rejected by the PNRR for failing to meet environmental criteria.","Naples: despite investment in a new metro between Afragola and the city centre, many existing lines remain unfinished, such as Line 6 and the Rainbow Line.",{"type":23,"level":24,"text":65},"Prospects for the future",{"type":18,"html":67},"\u003Cp>Despite the worrying picture, there are regulatory tools to address the problem. Article 21 of Legislative Decree 50\u002F2016 stipulates that unfinished works are included in the three-year public works programmes to ensure completion or to evaluate alternatives such as reuse, sale or demolition of abandoned structures. However, the effectiveness of these measures depends on the ability of administrations to manage resources efficiently.\u003C\u002Fp>\n",{"type":18,"html":69},"\u003Cp>\u003Cstrong>Data used:\u003C\u002Fstrong>\u003C\u002Fp>\n",{"type":71,"head":72,"rows":80,"numeric":234,"rowHeads":235,"title":236,"caption":38},"table",[73,74,75,76,77,78,79],"Survey area","Unfinished works 2021","Amount 2021 (€ thousand)","Cost to complete 2021 (€ thousand)","Unfinished works 2022","Amount 2022 (€ thousand)","Cost to complete 2022 (€ thousand)",[81,89,97,105,112,119,126,134,142,149,156,163,170,178,186,192,198,205,213,217,224,230,232],[82,83,84,85,86,87,88],"Total","377","1,817,782","1,254,951","373","2,501,542","1,320,634",[90,91,92,93,94,95,96],"Sicily","137","401,945","284,554","138","406,677","289,385",[98,99,100,101,102,103,104],"Sardinia","46","241,381","123,798","43","241,761","84,279",[106,107,108,109,107,110,111],"Apulia","27","35,442","30,568","105,851","48,872",[113,114,115,116,114,117,118],"Lazio","26","29,571","20,309","370,905","16,753",[120,121,122,123,121,124,125],"Calabria","20","68,348","101,365.73","53,029","29,656",[127,128,129,130,131,132,133],"Lombardy","19","107,452","59,316","18","86,152","63,123",[135,136,137,138,139,140,141],"Campania","5","4,221","4,079","17","157,291","56,089",[143,144,145,146,144,147,148],"Tuscany","13","14,097","3,474","10,544","3,232",[150,151,152,153,151,154,155],"Basilicata","11","35,873","27,969","34,899","26,869",[157,158,159,160,151,161,162],"Central administrations","15","656,957","428,332","838,017","551,634",[164,151,165,166,167,168,169],"Molise","133,223","122,385","10","133,617","122,355",[171,172,173,174,175,176,177],"Emilia-Romagna","6","8,012","1,232","8","6,372","895",[179,180,181,182,183,184,185],"Marche","12","29,510","19,812","7","10,400","5,115",[187,175,188,189,183,190,191],"Veneto","14,223","6,597","13,262","6,184",[193,175,194,195,172,196,197],"Umbria","5,091","2,493","3,781","1,364",[199,136,200,201,202,203,204],"Abruzzo","4,051","5,704","4","1,821","3,350",[206,207,208,209,210,211,212],"Liguria","2","15,817","6,090","3","18,274","7,889",[214,210,215,216,210,215,216],"Piedmont","8,491","2,091",[218,207,219,220,221,222,223],"Friuli-Venezia Giulia","914","1,550","1","399","1,500",[225,221,226,227,228,229,229],"Aosta Valley","2,712","3,048","0","-",[231,228,229,229,228,229,229],"Autonomous Province of Bolzano",[233,228,229,229,228,229,229],"Autonomous Province of Trento",[7,235,235,235,235,235,235],true,"Unfinished public works 2021-2022","*Italy continues to face the problem of unfinished public works, a phenomenon that negatively affects infrastructure efficiency and development. The analysis explores the evolution of the phenomenon, the main causes of blockages and some emblematic cases in the public transport sector.*","\u002Fapi\u002Fassets\u002F5f8d3cda-9662-49d8-b5bb-ed0fd49dc541",[240],{"thumb":241,"large":14,"full":238,"alt":13},"\u002Fapi\u002Fassets\u002F5f8d3cda-9662-49d8-b5bb-ed0fd49dc541?width=200&format=webp",{"title":38,"description":237,"image":38,"noindex":7},"en",[245,255,265],{"slug":246,"date":247,"theme":6,"featured":7,"title":248,"abstract":249,"cover":250,"coverAlt":251,"infographic":252,"infographicAlt":253,"infographicLarge":254,"infographicCount":15},"tpl-lombardia-lazio","2026-06-18","LPT and territorial disparities: Italy’s two-speed system reflected in the tenders issued by Milan and the Lazio region","An analytical comparison of fares, mileage and investment reveals a marked imbalance between funding in the North and that in the Centre and South for local public road transport. The analysis of the structural and economic state of Local Public Transport (LPT) in Italy compares two of the most significant tendering procedures of recent years: the tender issued by the Milan, Monza and Brianza, Lodi and Pavia basin, and the Lazio Region’s combined urban and extra-urban tender managed by Astral S.p.A. The data analysed reveal a clear and unequivocal divide in terms of the public resources allocated. The data examined show a clear and unequivocal divide in terms of public resources allocated. While the Milan basinallocates €1.248 billion for a 7-year contract, ensuring a weighted average compensation of €4.17 per km (rising to €4.46 per km when including over €86 million in capital contributions exclusively intended for fleet renewal), the Lazio Region has tendered a total value of €630.5 million spread over 9 years, corresponding to a weighted average compensation of just €2.33 per km, with no structural funding flows for vehicle fleets integrated into the base contract. Beyond the purely financial gap, a deep difference also emerges in the efficiency and administrative fluidity of the two procedures (in Lazio, the tender published in 2023 has yet to complete its awarding process), confirming the existence of territorial asymmetries that disadvantage Central and Southern Italy.","\u002Fapi\u002Fassets\u002Fcd91d059-329e-475e-be48-2ff8924344ec?width=800&format=webp","Mobility Metrics cover: side-by-side maps of the public transport tenders for the Milan basin (7-year contract, 5 lots) and the Lazio region (9 years, 11 lots, only 7 awarded)","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=500&format=webp","Infographic, Milan vs Lazio: weighted average fee of €4.17\u002Fkm against €2.33\u002Fkm, base tender value of €1.248bn against €630.5m, and no capital funding for new buses in Lazio","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=1000&format=webp",{"slug":256,"date":257,"theme":6,"featured":7,"title":258,"abstract":259,"cover":260,"coverAlt":261,"infographic":262,"infographicAlt":263,"infographicLarge":264,"infographicCount":15},"tpl-lombardia-como-lecco-e-varese","2026-05-06","Lombardia LPT: Como, Lecco and Varese head toward tender","The new tender for local public transport in the Como–Lecco–Varese catchment area represents one of the most significant steps in the reorganisation of local public transport in Lombardy. The Catchment Area Programme provides for a total of approximately 31.68 million vehicle-kilometres per year, divided into five territorial lots: Como and the Lake, Brianza Comasca, Lecco, Varese and the Valleys, and the Varese area. Added to these is the ‘Cable Car Lot’, already awarded in 2024. Economic estimates point to a total figure of approximately €71.03 million in tender fees and €21.31 million in expected fare revenue, for a total estimated value of around €92.33 million per year. The estimated average fee is €2.24\u002Fkm, whilst average fare revenue accounts for approximately €0.67\u002Fkm, bringing the average total economic value to approximately €2.92\u002Fkm. The catchment area has a complex industrial structure: 1,343 employees in total as at 31 December 2024, of whom 1,234 are to be transferred to the new operators; a requirement for 857 buses, of which 516 are classified as essential and 215 are to be procured from scratch; and a network of 44 depots, some of which are considered essential for the continuity of the service.","\u002Fapi\u002Fassets\u002Fed0efaa6-b23d-441e-8c51-9c1ac4eee67a?width=800&format=webp","Mobility Metrics cover: map of the five lots in the Como-Lecco-Varese public transport tender (Como and Lake, Brianza Comasca, Lecco, Varese and Valleys, Varesotto), over 31.6 million vehicle-km a year","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=500&format=webp","Infographic on the Como-Lecco-Varese tender: 5 lots, 31.7 million km a year (22.3 million interurban), €71 million annual compensation, 1,343 staff and 857 vehicles required","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=1000&format=webp",{"slug":266,"date":267,"theme":6,"featured":7,"title":268,"abstract":269,"cover":270,"coverAlt":271,"infographic":272,"infographicAlt":273,"infographicLarge":274,"infographicCount":15},"tpl-lombardia-2026-gare","2026-05-04","Lombardia LPT 2026: the \"tender of tenders\"","Lombardia’s local public transport (TPL) system is heading toward a structural transformation by 2026, with the phase-out of old concessions and the introduction of a more integrated and controlled model. The system is organized into 6 Basin Agencies: the largest, Milan, Monza and Brianza, Lodi, and Pavia, covers four provinces and manages about 160 million bus-km per year, while the others cover provincial or multi-provincial areas with different territorial characteristics (mountainous, urban, or suburban).","\u002Fapi\u002Fassets\u002Fbbf8a83a-6913-4fd1-acf5-d8ecf99dfe35?width=800&format=webp","Mobility Metrics cover: map of Lombardy divided into its 6 public transport basin agencies, showing the number of lots planned for each 2026 tender","\u002Fapi\u002Fassets\u002Fbd4ff53d-f6c8-44f7-9561-b8ee95c6fd55?width=500&format=webp","Infographic on Lombardy's 2026 public transport tenders by basin: 271.8 million km a year and €665.9m in compensation; Milan-Monza-Lodi-Pavia is the largest at 158 million km and €4.14\u002Fkm","\u002Fapi\u002Fassets\u002Fbd4ff53d-f6c8-44f7-9561-b8ee95c6fd55?width=1000&format=webp"]