[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"mm-article:gare-trasporto-pubblico:en:live":3},{"slug":4,"date":5,"theme":6,"featured":7,"title":8,"abstract":9,"cover":10,"coverAlt":11,"infographic":12,"infographicAlt":13,"infographicLarge":14,"infographicCount":15,"blocks":16,"metaDescription":9,"infographicFull":73,"infographics":74,"seo":77,"language":78,"unpublished":7,"related":79},"gare-trasporto-pubblico","2025-04-16","governance-regole-mercato",false,"Uncertainties and delays, the challenge of tenders in local public transport: long delays, few opportunities and a system that slows down the sector","In Italy, tenders for local public transport services are still few and far between and are characterised by extremely long delays. This slowness slows down the start-up of services, blocks investments and makes the market less attractive, compromising the development of the sector.","\u002Fapi\u002Fassets\u002F403092bc-a70a-4f64-b088-86fe9055e4cf?width=800&format=webp","Cover: stages of an LPT tender with expected timescales, compared with the Lazio Region tender launched in 2021","\u002Fapi\u002Fassets\u002F943c323c-c4dd-4450-98a7-b95bb5585ecd?width=500&format=webp","Infographic: LPT tender stages, expected to take 18–24 months, versus 30 months already spent on the Lazio tender; service start pushed back from 1 January 2024 to 1 January 2026","\u002Fapi\u002Fassets\u002F943c323c-c4dd-4450-98a7-b95bb5585ecd?width=1000&format=webp",1,[17,20,22,24,28,30,44,46,48,50,52,54,63,65,67,69,71],{"type":18,"html":19},"paragraph","\u003Cp>Public tenders for the award of local public transport services are, according to European Regulation 1370\u002F2007, the ordinary instrument for regulating the sector. However, in Italy this model is struggling to be consolidated.\u003C\u002Fp>\n",{"type":18,"html":21},"\u003Cp>The picture that emerges is that of a fragmented system, where realities coexist that have decisively set out on the path of tenders and others that remain tied to extensions, direct assignments, or situations of blockage.\u003C\u002Fp>\n",{"type":18,"html":23},"\u003Cp>In the last few years, the races have actually completed and operational, are very few. It is also confirmed by the last \u003Ca href=\"https:\u002F\u002Fwww.isfort.it\u002Fwp-content\u002Fuploads\u002F2023\u002F12\u002FRapportoMobilita2023_Def.pdf\">Report on the Mobility of the Italians\u003C\u002Fa>published by \u003Cstrong>ISFORT\u003C\u002Fstrong> in December \u003Cstrong>2023\u003C\u002Fstrong>according to many regions have preferred to maintain the existing structures. The basis of this choice, there are often a lack of technical facilities adequate and the fear of litigation.\u003C\u002Fp>\n",{"type":25,"level":26,"text":27},"heading",2,"The phases of the tendering process in public transport",{"type":18,"html":29},"\u003Cp>A tendering procedure for the award of LPT services by road is generally developed through the following phases:\u003C\u002Fp>\n",{"type":31,"ordered":32,"icon":33,"items":34},"list",true,null,[35,36,37,38,39,40,41,42,43],"Publication of the pre-information notice","Publication of the report identifying the lots to be put out to tender","Conducting the consultation procedure","Drafting and publication of the Report for the Assignment (including EFP)","Preparation of tender documents","Submission of bids","Evaluation of bids","Awarding of service","Service start-up",{"type":18,"html":45},"\u003Cp>The resolution of the Authority of Regulation of Transportation (\u003Cstrong>ART\u003C\u002Fstrong>) \u003Cstrong>no. 154\u002F2019\u003C\u002Fstrong>in continuity with the \u003Cstrong>no. 48\u002F2017\u003C\u002Fstrong>, defines some of the essential elements of the process: the \u003Cstrong>consultation\u003C\u002Fstrong> should be initiated \u003Cstrong>within60 days from the publication of the lots;\u003C\u002Fstrong> the Authority may express comments on \u003Cstrong>Report for the award\u003C\u002Fstrong> within 45 days of its receipt. the minimum time limit for the \u003Cstrong>presentation\u003C\u002Fstrong> of \u003Cstrong>offers\u003C\u002Fstrong> must be \u003Cstrong>at least 110 days from the publication of the notice\u003C\u002Fstrong>.\u003C\u002Fp>\n",{"type":18,"html":47},"\u003Cp>For the other phases, however, no specific deadlines are set, leaving ample room for defining the actual timeframe.In general, the process should last approximately 14-16 months and in any case not more than two years.\u003C\u002Fp>\n",{"type":18,"html":49},"\u003Cp>It should also be borne in mind that once the service has been awarded, participating companies have approximately 30 days to lodge any appeals with the TAR. The outcome of these proceedings can take up to over a year, further affecting the start-up time.\u003C\u002Fp>\n",{"type":25,"level":26,"text":51},"The case of the Region of Lazio: the procedure is still in progress since 2023",{"type":18,"html":53},"\u003Cp>An emblematic example of the length of the timeframe is represented by the tender launched by the Lazio Region for the procedure of entrusting the LPT road service of 11 lots (excluding the interurban service of the city of Rome). Below are the main time steps:\u003C\u002Fp>\n",{"type":31,"ordered":7,"icon":33,"items":55},[56,57,58,59,60,61,62],"November 2021: with Regional Decree no. 801\u002F2021, the Lazio Region formally initiates the tender process, entrusting ASTRAL S.p.A. with the management of the procedure.","\u003Cstrong>December 29, 2021 – February 28, 2022\u003C\u002Fstrong>takes place on the public consultation period relating to the proposed joint in 11 lots, corresponding to the Network Drive (UdR) identified.","\u003Cstrong>December 29, 2022\u003C\u002Fstrong>is approved the Report for the award with the decision of the regional Council no. 1253.","13 January 2023: the call for tenders is published.","June - October 2023: the deadline for submitting bids, initially scheduled for June, is first slipped to July, then finally set for 16 October.","\u003Cstrong>September – November 2023\u003C\u002Fstrong>September is established, the commission, with work expected to start from the 18th of October, then returned to the beginning of November.","31 January 2025: According to the latest available update, the evaluation of bids is still ongoing.",{"type":18,"html":64},"\u003Cp>The announcement included the launch of the new service \u003Cstrong>January 1, 2024\u003C\u002Fstrong>but in the four years since the start of the path (2021), and two years after the publication of it (2023), the procedure is still in the stage of preliminary assessment. Currently, the forecast for the start of the service, subject to further slippages, are scheduled for 1 January 2026.\u003C\u002Fp>\n",{"type":18,"html":66},"\u003Cp>The case of Lazio clearly highlights two central critical issues: the scarcity of tenders and the excessive duration of the processes. Such long delays, particularly between the award and the actual start of the service, risk rendering obsolete the economic, technical and operational assumptions on which the tender was built.\u003C\u002Fp>\n",{"type":25,"level":26,"text":68},"Effects of delays in tendering procedures",{"type":18,"html":70},"\u003Cp>Long waits in the tendering process prevent indispensable investments in rolling stock, thus holding back the development and quality of the service. In addition, the uncertainty and slowness of the process reduce the attractiveness of the market, making it less competitive and less attractive to operators and investors, discouraging their participation.\u003C\u002Fp>\n",{"type":18,"html":72},"\u003Cp>For more on the topic of bidding in LPT, read also: \u003Ca href=\"https:\u002F\u002Fwww.basco-t.com\u002Fen\u002Fframmentazione-del-tpl-gare-2026\u002F\">Frameworking the LPT sector in Italy: the key role of M&amp;A ahead of the 2026 tenders\u003C\u002Fa> and \u003Ca href=\"https:\u002F\u002Fwww.basco-t.com\u002Fen\u002Fvalutazione-aziende-trasporto-pubblico\u002F\">How much is a public transport company really worth?\u003C\u002Fa>\u003C\u002Fp>\n","\u002Fapi\u002Fassets\u002F943c323c-c4dd-4450-98a7-b95bb5585ecd",[75],{"thumb":76,"large":14,"full":73,"alt":13},"\u002Fapi\u002Fassets\u002F943c323c-c4dd-4450-98a7-b95bb5585ecd?width=200&format=webp",{"title":33,"description":33,"image":33,"noindex":7},"en",[80,90,100],{"slug":81,"date":82,"theme":6,"featured":7,"title":83,"abstract":84,"cover":85,"coverAlt":86,"infographic":87,"infographicAlt":88,"infographicLarge":89,"infographicCount":15},"tpl-lombardia-lazio","2026-06-18","LPT and territorial disparities: Italy’s two-speed system reflected in the tenders issued by Milan and the Lazio region","An analytical comparison of fares, mileage and investment reveals a marked imbalance between funding in the North and that in the Centre and South for local public road transport. The analysis of the structural and economic state of Local Public Transport (LPT) in Italy compares two of the most significant tendering procedures of recent years: the tender issued by the Milan, Monza and Brianza, Lodi and Pavia basin, and the Lazio Region’s combined urban and extra-urban tender managed by Astral S.p.A. The data analysed reveal a clear and unequivocal divide in terms of the public resources allocated. The data examined show a clear and unequivocal divide in terms of public resources allocated. While the Milan basinallocates €1.248 billion for a 7-year contract, ensuring a weighted average compensation of €4.17 per km (rising to €4.46 per km when including over €86 million in capital contributions exclusively intended for fleet renewal), the Lazio Region has tendered a total value of €630.5 million spread over 9 years, corresponding to a weighted average compensation of just €2.33 per km, with no structural funding flows for vehicle fleets integrated into the base contract. Beyond the purely financial gap, a deep difference also emerges in the efficiency and administrative fluidity of the two procedures (in Lazio, the tender published in 2023 has yet to complete its awarding process), confirming the existence of territorial asymmetries that disadvantage Central and Southern Italy.","\u002Fapi\u002Fassets\u002Fcd91d059-329e-475e-be48-2ff8924344ec?width=800&format=webp","Mobility Metrics cover: side-by-side maps of the public transport tenders for the Milan basin (7-year contract, 5 lots) and the Lazio region (9 years, 11 lots, only 7 awarded)","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=500&format=webp","Infographic, Milan vs Lazio: weighted average fee of €4.17\u002Fkm against €2.33\u002Fkm, base tender value of €1.248bn against €630.5m, and no capital funding for new buses in Lazio","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=1000&format=webp",{"slug":91,"date":92,"theme":6,"featured":7,"title":93,"abstract":94,"cover":95,"coverAlt":96,"infographic":97,"infographicAlt":98,"infographicLarge":99,"infographicCount":15},"tpl-lombardia-como-lecco-e-varese","2026-05-06","Lombardia LPT: Como, Lecco and Varese head toward tender","The new tender for local public transport in the Como–Lecco–Varese catchment area represents one of the most significant steps in the reorganisation of local public transport in Lombardy. The Catchment Area Programme provides for a total of approximately 31.68 million vehicle-kilometres per year, divided into five territorial lots: Como and the Lake, Brianza Comasca, Lecco, Varese and the Valleys, and the Varese area. Added to these is the ‘Cable Car Lot’, already awarded in 2024. Economic estimates point to a total figure of approximately €71.03 million in tender fees and €21.31 million in expected fare revenue, for a total estimated value of around €92.33 million per year. The estimated average fee is €2.24\u002Fkm, whilst average fare revenue accounts for approximately €0.67\u002Fkm, bringing the average total economic value to approximately €2.92\u002Fkm. The catchment area has a complex industrial structure: 1,343 employees in total as at 31 December 2024, of whom 1,234 are to be transferred to the new operators; a requirement for 857 buses, of which 516 are classified as essential and 215 are to be procured from scratch; and a network of 44 depots, some of which are considered essential for the continuity of the service.","\u002Fapi\u002Fassets\u002Fed0efaa6-b23d-441e-8c51-9c1ac4eee67a?width=800&format=webp","Mobility Metrics cover: map of the five lots in the Como-Lecco-Varese public transport tender (Como and Lake, Brianza Comasca, Lecco, Varese and Valleys, Varesotto), over 31.6 million vehicle-km a year","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=500&format=webp","Infographic on the Como-Lecco-Varese tender: 5 lots, 31.7 million km a year (22.3 million interurban), €71 million annual compensation, 1,343 staff and 857 vehicles required","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=1000&format=webp",{"slug":101,"date":102,"theme":6,"featured":7,"title":103,"abstract":104,"cover":105,"coverAlt":106,"infographic":107,"infographicAlt":108,"infographicLarge":109,"infographicCount":15},"tpl-lombardia-2026-gare","2026-05-04","Lombardia LPT 2026: the \"tender of tenders\"","Lombardia’s local public transport (TPL) system is heading toward a structural transformation by 2026, with the phase-out of old concessions and the introduction of a more integrated and controlled model. The system is organized into 6 Basin Agencies: the largest, Milan, Monza and Brianza, Lodi, and Pavia, covers four provinces and manages about 160 million bus-km per year, while the others cover provincial or multi-provincial areas with different territorial characteristics (mountainous, urban, or suburban).","\u002Fapi\u002Fassets\u002Fbbf8a83a-6913-4fd1-acf5-d8ecf99dfe35?width=800&format=webp","Mobility Metrics cover: map of Lombardy divided into its 6 public transport basin agencies, showing the number of lots planned for each 2026 tender","\u002Fapi\u002Fassets\u002Fbd4ff53d-f6c8-44f7-9561-b8ee95c6fd55?width=500&format=webp","Infographic on Lombardy's 2026 public transport tenders by basin: 271.8 million km a year and €665.9m in compensation; Milan-Monza-Lodi-Pavia is the largest at 158 million km and €4.14\u002Fkm","\u002Fapi\u002Fassets\u002Fbd4ff53d-f6c8-44f7-9561-b8ee95c6fd55?width=1000&format=webp"]