---
title: "Piemonte region public transport tenders: South-East basin, two lots up for tender covering 13.87 million km/year and €28.6 million in annual compensation | Mobility Metrics | Basco&T"
description: "The structure of the South-East Basin is clearly defined in the AMP report: two lots are put out to tender for €28,5 million per year in compensation and €15,3 million per year in expected revenue, separated from the weak-demand sub-lot of Val Borbera, which is handled outside the competitive perimeter."
canonical_url: "https://www.basco-t.com/en/mobility-metrics/gare-tpl-piemonte-bacino-sud-est"
locale: en
meta:
  "og:description": "The structure of the South-East Basin is clearly defined in the AMP report: two lots are put out to tender for €28,5 million per year in compensation and €15,3 million per year in expected revenue, separated from the weak-demand sub-lot of Val Borbera, which is handled outside the competitive perimeter."
  "og:image": "https://www.basco-t.com/api/assets/5f9eb074-417a-4d9c-a2f2-480396c0fdf2?width=1200&format=jpg&height=630&fit=cover&quality=80"
  "og:image:alt": "Map of Piemonte's South-East public transport basin: the Asti and Alessandria tender lots and the low-demand Val Borbera sub-lot, with buses and a historic tower"
  "og:title": "Piemonte region public transport tenders: South-East basin, two lots up for tender covering 13.87 million km/year and €28.6 million in annual compensation | Mobility Metrics | Basco&T"
  "twitter:description": "The structure of the South-East Basin is clearly defined in the AMP report: two lots are put out to tender for €28,5 million per year in compensation and €15,3 million per year in expected revenue, separated from the weak-demand sub-lot of Val Borbera, which is handled outside the competitive perimeter."
  "twitter:image:alt": "Map of Piemonte's South-East public transport basin: the Asti and Alessandria tender lots and the low-demand Val Borbera sub-lot, with buses and a historic tower"
  "twitter:title": "Piemonte region public transport tenders: South-East basin, two lots up for tender covering 13.87 million km/year and €28.6 million in annual compensation | Mobility Metrics | Basco&T"
---

> Index of every page on this site: [llms.txt](https://www.basco-t.com/llms.txt)

[←** Back to articles**](https://www.basco-t.com/en/mobility-metrics)

Governance, Regulation & Competitive Markets**27 April 2026**

# **Piemonte region public transport tenders:****South-East basin, two lots up for tender covering 13.87 million km/year and €28.6 million in annual compensation**

The structure of the South-East Basin is clearly defined in the AMP report: two lots are put out to tender for €28,5 million per year in compensation and €15,3 million per year in expected revenue, separated from the weak-demand sub-lot of Val Borbera, which is handled outside the competitive perimeter.

**Share**

- [Share on LinkedIn](https://www.linkedin.com/sharing/share-offsite/?url=https%3A%2F%2Fwww.basco-t.com%2Fen%2Fmobility-metrics%2Fgare-tpl-piemonte-bacino-sud-est)
- [Share on Facebook](https://www.facebook.com/sharer/sharer.php?u=https%3A%2F%2Fwww.basco-t.com%2Fen%2Fmobility-metrics%2Fgare-tpl-piemonte-bacino-sud-est)
-

**Follow us**

- [Basco&T on LinkedIn](https://www.linkedin.com/company/basco-t/)
- [Basco&T on Facebook](https://www.facebook.com/profile.php?id=61573738169898)
- [Basco&T on Instagram](https://www.instagram.com/mobility_metrics/)

The configuration of the South-East Basin is already clearly outlined, with a distinct separation between services put out to tender and components directly awarded. The overall design highlights a coherent framework, built on both quantitative and territorial foundations.

The services under tender are organized into two main lots, totaling 13,870,286 km/year, with annual compensation of €28,594,722 and expected fare revenues of €15,397,158. The overall average value stands at €3.17 per km, with a planned commercial speed of approximately 31.4 km/h.

**Lot 1 (AT)** covers the area of Asti, Canelli, and Villanova d’Asti, for 5,144,088 km/year, with €10,517,051 per year in compensation and €5,663,027 per year in expected revenues.

**Lot 2 (AL)**, on the other hand, includes Alessandria, Casale Monferrato, Novi Ligure, Ovada, and connections with the surrounding territory, for 8,726,198 km/year, with €18,077,671 per year in compensation and €9,734,131 per year in expected revenues.

Alongside the tendered lots, a **weak-demand sub-lot** is предусмотрено in Val Borbera (274,502 km/year and €590,000 per year in compensation), directly awarded and treated separately from the competitive perimeter.

This structure confirms a non-uniform configuration of the basin.

Overall, the South-East Basin also presents itself as a mature structure: identified lots, clearly defined territories, quantified economic figures, and an explicit separation between tendered services and weak-demand services.

| South-East – up for tender | Lot 1 AT (UR1) | 5,144,088 | 10,517,051 | 5,663,027 | 2.04 | 1.10 | 3.15 | 31.4 | Urban, extra-urban | Asti, Canelli, Villanova d’Asti |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
| South-East – up for tender | Lot 2 AL (UR2 + UR3) | 8,726,198 | 18,077,671 | 9,734,131 | 2.07 | 1.12 | 3.19 | 30.86 | Urban, extra-urban | Alessandria, Casale Monferrato, Altavilla, Novi Ligure, Ovada |
| Total lots up for tender | 2 lots up for tender + 1 low-demand area lot awarded directly | 13,870,286 | 28,594,722 | 15,397,158 | 2.06 | 1.11 | 3.17 | 31.4 |  | |
| South-East – low-demand area lot | Val Borbera low-demand area lot | 274,502 | 590,000 |  | 2.15 | n/a | n/a |  | Extra-urban | Val Borbera, connections to Arquata Scrivia and Novi Ligure |
| Basin total |  | 14,144,788 | 29,184,722 |  |  |  |  |  |  | |

[**Share on LinkedIn**](https://www.linkedin.com/sharing/share-offsite/?url=https%3A%2F%2Fwww.basco-t.com%2Fen%2Fmobility-metrics%2Fgare-tpl-piemonte-bacino-sud-est) [** Share on Facebook**](https://www.facebook.com/sharer/sharer.php?u=https%3A%2F%2Fwww.basco-t.com%2Fen%2Fmobility-metrics%2Fgare-tpl-piemonte-bacino-sud-est)

**Follow us**

- [Basco&T on LinkedIn](https://www.linkedin.com/company/basco-t/)
- [Basco&T on Facebook](https://www.facebook.com/profile.php?id=61573738169898)
- [Basco&T on Instagram](https://www.instagram.com/mobility_metrics/)

**Newsletter **

## **Stay Updated**

Subscribe to our newsletter and receive the latest reports.

## **Related analyses**

[Governance, Regulation & Competitive Markets**18 June 2026**<h3>**LPT and territorial disparities:****Italy’s two-speed system reflected in the tenders issued by Milan and the Lazio region**</h3>Read article](https://www.basco-t.com/en/mobility-metrics/tpl-lombardia-lazio)

[Governance, Regulation & Competitive Markets**6 May 2026**<h3>**Lombardia LPT:****Como, Lecco and Varese head toward tender**</h3>Read article](https://www.basco-t.com/en/mobility-metrics/tpl-lombardia-como-lecco-e-varese)

[Governance, Regulation & Competitive Markets**4 May 2026**<h3>**Lombardia LPT 2026:****the "tender of tenders"**</h3>Read article](https://www.basco-t.com/en/mobility-metrics/tpl-lombardia-2026-gare)

```json
{"@context":"https://schema.org","@graph":[{"@id":"https://www.basco-t.com/en#website","@type":"WebSite","inLanguage":"en-GB","name":"Basco&T","url":"https://www.basco-t.com/en","publisher":{"@id":"https://www.basco-t.com/#identity"},"translationOfWork":{"@id":"https://www.basco-t.com/it#website"}},{"@id":"https://www.basco-t.com/en/mobility-metrics/gare-tpl-piemonte-bacino-sud-est#webpage","@type":"WebPage","datePublished":"2026-04-27","description":"The structure of the South-East Basin is clearly defined in the AMP report: two lots are put out to tender for €28,5 million per year in compensation and €15,3 million per year in expected revenue, separated from the weak-demand sub-lot of Val Borbera, which is handled outside the competitive perimeter.","name":"Piemonte region public transport tenders: South-East basin, two lots up for tender covering 13.87 million km/year and €28.6 million in annual compensation | Mobility Metrics | Basco&T","url":"https://www.basco-t.com/en/mobility-metrics/gare-tpl-piemonte-bacino-sud-est","isPartOf":{"@id":"https://www.basco-t.com/en#website"},"potentialAction":[{"@type":"ReadAction","target":["https://www.basco-t.com/en/mobility-metrics/gare-tpl-piemonte-bacino-sud-est"]}],"primaryImageOfPage":{"@id":"https://www.basco-t.com/#logo"}},{"@id":"https://www.basco-t.com/#identity","@type":"Organization","name":"Basco&T","url":"https://www.basco-t.com","logo":{"@id":"https://www.basco-t.com/#logo"},"sameAs":["https://www.linkedin.com/company/basco-t/","https://www.facebook.com/profile.php?id=61573738169898","https://www.instagram.com/mobility_metrics/"]},{"@id":"https://www.basco-t.com/en/mobility-metrics/gare-tpl-piemonte-bacino-sud-est#article","@type":"Article","datePublished":"2026-04-27","description":"The structure of the South-East Basin is clearly defined in the AMP report: two lots are put out to tender for €28,5 million per year in compensation and €15,3 million per year in expected revenue, separated from the weak-demand sub-lot of Val Borbera, which is handled outside the competitive perimeter.","headline":"Piemonte region public transport tenders: South-East basin, two lots up for tender covering 13.87 million","inLanguage":"en-GB","thumbnailUrl":"https://www.basco-t.com/api/assets/5f9eb074-417a-4d9c-a2f2-480396c0fdf2?width=800&format=webp","author":{"@id":"https://www.basco-t.com/#identity"},"image":{"@id":"https://www.basco-t.com/#/schema/image/1"},"isPartOf":{"@id":"https://www.basco-t.com/en/mobility-metrics/gare-tpl-piemonte-bacino-sud-est#webpage"},"mainEntityOfPage":{"@id":"https://www.basco-t.com/en/mobility-metrics/gare-tpl-piemonte-bacino-sud-est#webpage"},"publisher":{"@id":"https://www.basco-t.com/#identity"}},{"@id":"https://www.basco-t.com/#logo","@type":"ImageObject","caption":"Basco&T","contentUrl":"https://www.basco-t.com/logos/Logo Sfondo Bianco.png","inLanguage":"en-GB","url":"https://www.basco-t.com/logos/Logo Sfondo Bianco.png"},{"@id":"https://www.basco-t.com/#/schema/image/1","@type":"ImageObject","contentUrl":"https://www.basco-t.com/api/assets/5f9eb074-417a-4d9c-a2f2-480396c0fdf2?width=800&format=webp","inLanguage":"en-GB","url":"https://www.basco-t.com/api/assets/5f9eb074-417a-4d9c-a2f2-480396c0fdf2?width=800&format=webp"}]}
```

## Sitemap

See the full [sitemap](https://www.basco-t.com/sitemap.md) for all pages.
