[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"mm-article:gare-tpl-2026:en:live":3},{"slug":4,"date":5,"theme":6,"featured":7,"title":8,"abstract":9,"cover":10,"coverAlt":11,"infographic":12,"infographicAlt":13,"infographicLarge":14,"infographicCount":15,"blocks":16,"metaDescription":9,"infographicFull":56,"infographics":57,"seo":60,"language":61,"unpublished":7,"related":62},"gare-tpl-2026","2026-04-14","governance-regole-mercato",false,"Public transport tenders, the mirage of 2026: a map of a sector paralyzed between extensions, deserted bids, and endless appeals.","The labyrinth of public transport tenders: the 2026 deadline is a mirage — and companies are left stranded.","\u002Fapi\u002Fassets\u002Fd841121f-ab5b-4869-a2f5-21c7355acee6?width=800&format=webp","The 9 stages of the public transport tender process and the status of basins in Piemonte, Lombardy and Emilia-Romagna, many still at the award report stage","\u002Fapi\u002Fassets\u002F7622390a-8ca8-4b60-a252-05c0b4641032?width=500&format=webp","Map of Italy showing public transport tender status by region: ongoing, planned or none, with 2026 deadlines, extensions, and deserted or suspended tenders","\u002Fapi\u002Fassets\u002F7622390a-8ca8-4b60-a252-05c0b4641032?width=1000&format=webp",1,[17,20,22,26,28,30,32,34,42,44,46,48,50,52,54],{"type":18,"html":19},"paragraph","\u003Cp>The Local Public Transport sector in Italy continues to move at two speeds, but with one major common denominator: uncertainty. On the one hand, companies are expected to lead the ecological transition and modernize their fleets; on the other, they are forced to operate within a precarious regulatory and contractual framework, marked by unrealistic deadlines and exhausting bureaucratic procedures.\u003C\u002Fp>\n",{"type":18,"html":21},"\u003Cp>At the heart of this paralysis lies the notorious deadline of December 31, 2026.\u003C\u002Fp>\n",{"type":23,"level":24,"text":25},"heading",2,"The illusion of the “Covid extension”",{"type":18,"html":27},"\u003Cp>To mitigate the devastating effects of the pandemic and give the sector some breathing space, the legislator intervened with the Sostegni-ter Decree (Article 24, paragraph 5-bis of Decree-Law 4\u002F2022, converted into Law 25\u002F2022). This provision allowed Regions to extend the duration of existing public service contracts no later than December 31, 2026, making use of the provisions of EU Regulation 1370\u002F2007. The objective was a worthy one: to support investment in local public transport and offset losses linked to Covid-19 containment measures.\u003C\u002Fp>\n",{"type":18,"html":29},"\u003Cp>However, what was meant to be a temporary window to reorganize the system and prepare new tenders in time is turning into yet another Italian mirage. Looking at the current map of contract awards, it is clear that the 2026 deadline will not be met.\u003C\u002Fp>\n",{"type":23,"level":24,"text":31},"A fragmented and delayed national landscape",{"type":18,"html":33},"\u003Cp>An analysis of the current situation at regional level reveals a patchy scenario, where delays dominate:\u003C\u002Fp>\n",{"type":35,"ordered":7,"icon":36,"items":37},"list",null,[38,39,40,41],"\u003Cstrong>Stalled or deserted tenders:\u003C\u002Fstrong> In some regions, procedures have been launched but are colliding with the harsh realities of the market. A striking example is Basilicata, where the lots for regional services and for the provinces of Potenza and Matera, launched in 2024, received no bids, with the sole exception of the lot for the Municipality of Matera.","\u003Cstrong>Still up in the air:\u003C\u002Fstrong> In Calabria, the new plan and timetable for the future tender are still “being defined,” under strong pressure and repeated warnings from the Italian Competition Authority (AGCM) over continuous direct extensions. In Sardinia, contracts are nearing expiry, yet there is currently “no clear plan” in place. Veneto is still in the process of outlining its new governance system.","\u003Cstrong>Slow-moving procedures:\u003C\u002Fstrong> Regions such as Lazio, Umbria, and Sicily have tenders currently underway, but the administrative timelines for completion, evaluation, and the inevitable wave of appeals before administrative courts make any swift resolution impossible.","\u003Cstrong>“In-house” exceptions:\u003C\u002Fstrong> Some territories have effectively locked in services through direct in-house awards, such as Abruzzo (until 2027), Liguria, and Trentino-Alto Adige (with deadlines extending as far as 2031).",{"type":18,"html":43},"\u003Cp>Considering that some regions have yet to even begin the process or are only at the stage of preliminary consultation (such as local public transport in Verona), and given the extremely long timelines of administrative justice and evaluation committees, it is entirely reasonable to assume that final contract awards \u003Cstrong>will not be seen for another two or three years\u003C\u002Fstrong>. In effect, 2026 has already slipped.\u003C\u002Fp>\n",{"type":23,"level":24,"text":45},"The consequences: a “limbo” that stalls development",{"type":18,"html":47},"\u003Cp>All of this translates into significant damage for the real economy. This situation places transport companies in a limbo of uncertainty that undermines planning and the programming of investments.\u003C\u002Fp>\n",{"type":18,"html":49},"\u003Cp>How can a company purchase dozens of new electric buses, build charging infrastructure, or hire and train new drivers if it does not know whether it will still hold the operating concession in that area in two years’ time? Investments in local public transport require long-term amortization plans and solid bank guarantees—conditions that no series of short-term extensions, renewed every few months, can ever support.\u003C\u002Fp>\n",{"type":23,"level":24,"text":51},"Local public transport is not an emergency—it is an industry",{"type":18,"html":53},"\u003Cp>Once again, Local Public Transport in Italy is not being treated as a true industrial sector. It is managed with a logic of permanent emergency, continuous postponements, and patchwork regulations, overlooking the fact that the companies that keep the country moving need certainty, a stable regulatory framework, and reliable administrative timelines in order to plan their business over the long term.\u003C\u002Fp>\n",{"type":18,"html":55},"\u003Cp>Until institutions guarantee this basic ecosystem, the risk is not only that tenders will go deserted, but that citizens will be left with a stagnant service, unable to evolve or respond to the challenges of future mobility.\u003C\u002Fp>\n","\u002Fapi\u002Fassets\u002F7622390a-8ca8-4b60-a252-05c0b4641032",[58],{"thumb":59,"large":14,"full":56,"alt":13},"\u002Fapi\u002Fassets\u002F7622390a-8ca8-4b60-a252-05c0b4641032?width=200&format=webp",{"title":36,"description":36,"image":36,"noindex":7},"en",[63,73,83],{"slug":64,"date":65,"theme":6,"featured":7,"title":66,"abstract":67,"cover":68,"coverAlt":69,"infographic":70,"infographicAlt":71,"infographicLarge":72,"infographicCount":15},"tpl-lombardia-lazio","2026-06-18","LPT and territorial disparities: Italy’s two-speed system reflected in the tenders issued by Milan and the Lazio region","An analytical comparison of fares, mileage and investment reveals a marked imbalance between funding in the North and that in the Centre and South for local public road transport. The analysis of the structural and economic state of Local Public Transport (LPT) in Italy compares two of the most significant tendering procedures of recent years: the tender issued by the Milan, Monza and Brianza, Lodi and Pavia basin, and the Lazio Region’s combined urban and extra-urban tender managed by Astral S.p.A. The data analysed reveal a clear and unequivocal divide in terms of the public resources allocated. The data examined show a clear and unequivocal divide in terms of public resources allocated. While the Milan basinallocates €1.248 billion for a 7-year contract, ensuring a weighted average compensation of €4.17 per km (rising to €4.46 per km when including over €86 million in capital contributions exclusively intended for fleet renewal), the Lazio Region has tendered a total value of €630.5 million spread over 9 years, corresponding to a weighted average compensation of just €2.33 per km, with no structural funding flows for vehicle fleets integrated into the base contract. Beyond the purely financial gap, a deep difference also emerges in the efficiency and administrative fluidity of the two procedures (in Lazio, the tender published in 2023 has yet to complete its awarding process), confirming the existence of territorial asymmetries that disadvantage Central and Southern Italy.","\u002Fapi\u002Fassets\u002Fcd91d059-329e-475e-be48-2ff8924344ec?width=800&format=webp","Mobility Metrics cover: side-by-side maps of the public transport tenders for the Milan basin (7-year contract, 5 lots) and the Lazio region (9 years, 11 lots, only 7 awarded)","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=500&format=webp","Infographic, Milan vs Lazio: weighted average fee of €4.17\u002Fkm against €2.33\u002Fkm, base tender value of €1.248bn against €630.5m, and no capital funding for new buses in Lazio","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=1000&format=webp",{"slug":74,"date":75,"theme":6,"featured":7,"title":76,"abstract":77,"cover":78,"coverAlt":79,"infographic":80,"infographicAlt":81,"infographicLarge":82,"infographicCount":15},"tpl-lombardia-como-lecco-e-varese","2026-05-06","Lombardia LPT: Como, Lecco and Varese head toward tender","The new tender for local public transport in the Como–Lecco–Varese catchment area represents one of the most significant steps in the reorganisation of local public transport in Lombardy. The Catchment Area Programme provides for a total of approximately 31.68 million vehicle-kilometres per year, divided into five territorial lots: Como and the Lake, Brianza Comasca, Lecco, Varese and the Valleys, and the Varese area. Added to these is the ‘Cable Car Lot’, already awarded in 2024. Economic estimates point to a total figure of approximately €71.03 million in tender fees and €21.31 million in expected fare revenue, for a total estimated value of around €92.33 million per year. The estimated average fee is €2.24\u002Fkm, whilst average fare revenue accounts for approximately €0.67\u002Fkm, bringing the average total economic value to approximately €2.92\u002Fkm. The catchment area has a complex industrial structure: 1,343 employees in total as at 31 December 2024, of whom 1,234 are to be transferred to the new operators; a requirement for 857 buses, of which 516 are classified as essential and 215 are to be procured from scratch; and a network of 44 depots, some of which are considered essential for the continuity of the service.","\u002Fapi\u002Fassets\u002Fed0efaa6-b23d-441e-8c51-9c1ac4eee67a?width=800&format=webp","Mobility Metrics cover: map of the five lots in the Como-Lecco-Varese public transport tender (Como and Lake, Brianza Comasca, Lecco, Varese and Valleys, Varesotto), over 31.6 million vehicle-km a year","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=500&format=webp","Infographic on the Como-Lecco-Varese tender: 5 lots, 31.7 million km a year (22.3 million interurban), €71 million annual compensation, 1,343 staff and 857 vehicles required","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=1000&format=webp",{"slug":84,"date":85,"theme":6,"featured":7,"title":86,"abstract":87,"cover":88,"coverAlt":89,"infographic":90,"infographicAlt":91,"infographicLarge":92,"infographicCount":15},"tpl-lombardia-2026-gare","2026-05-04","Lombardia LPT 2026: the \"tender of tenders\"","Lombardia’s local public transport (TPL) system is heading toward a structural transformation by 2026, with the phase-out of old concessions and the introduction of a more integrated and controlled model. The system is organized into 6 Basin Agencies: the largest, Milan, Monza and Brianza, Lodi, and Pavia, covers four provinces and manages about 160 million bus-km per year, while the others cover provincial or multi-provincial areas with different territorial characteristics (mountainous, urban, or suburban).","\u002Fapi\u002Fassets\u002Fbbf8a83a-6913-4fd1-acf5-d8ecf99dfe35?width=800&format=webp","Mobility Metrics cover: map of Lombardy divided into its 6 public transport basin agencies, showing the number of lots planned for each 2026 tender","\u002Fapi\u002Fassets\u002Fbd4ff53d-f6c8-44f7-9561-b8ee95c6fd55?width=500&format=webp","Infographic on Lombardy's 2026 public transport tenders by basin: 271.8 million km a year and €665.9m in compensation; Milan-Monza-Lodi-Pavia is the largest at 158 million km and €4.14\u002Fkm","\u002Fapi\u002Fassets\u002Fbd4ff53d-f6c8-44f7-9561-b8ee95c6fd55?width=1000&format=webp"]