[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"mm-article:fondo-nazionale-trasporti-inflazione:en:live":3},{"slug":4,"date":5,"theme":6,"featured":7,"title":8,"abstract":9,"cover":10,"coverAlt":11,"infographic":12,"infographicAlt":13,"infographicLarge":14,"infographicCount":15,"blocks":16,"metaDescription":9,"infographicFull":150,"infographics":151,"seo":154,"language":155,"unpublished":7,"related":156},"fondo-nazionale-trasporti-inflazione","2025-11-24","governance-regole-mercato",false,"Inflation vs National Transport Fund: the gap that threatens the sustainability of the service","Over the last five years, the increase in the National Transport Fund (FNT) has been significantly lower than the growth in the sector-specific inflation index (F.O.I. Transport). Between 2021 and 2025, transport companies received on average €350–400 million less per year than was necessary to offset the increase in costs, accumulating a total loss of more than €1.5 billion.","\u002Fapi\u002Fassets\u002F6c91dd75-c747-4240-8250-2a2387fdbbbf?width=800&format=webp","Line chart: National Transport Fund compared with the fund adjusted for sector inflation, a cumulative gap of €1.54bn between 2021 and 2025","\u002Fapi\u002Fassets\u002Fd5a05b84-2c89-4c21-ad40-07494546a72a?width=500&format=webp","Line chart 2021-2025: National Transport Fund rising from €4.87bn to €5.34bn against €5.65bn if inflation-adjusted; annual shortfall up to €496m, €1.54bn in total","\u002Fapi\u002Fassets\u002Fd5a05b84-2c89-4c21-ad40-07494546a72a?width=1000&format=webp",1,[17,20,24,26,28,93,95,101,103,105,110,112,114,116,118,123,125,127,129,136,138,140,142,148],{"type":18,"html":19},"paragraph","\u003Cp>Trade associations – Agens, ANAV, and Asstra – have repeatedly denounced this imbalance, calling for urgent action to ensure the economic sustainability of local public transport.\u003C\u002Fp>\n",{"type":21,"level":22,"text":23},"heading",2,"Data and methodology",{"type":18,"html":25},"\u003Cp>The analysis compares the National Transport Fund for the period 2021–2025 with the value it should have reached in order to maintain constant purchasing power, calculated using the F.O.I. Transport index. The result is a clear picture of the gap between available resources and the actual costs of the sector.\u003C\u002Fp>\n",{"type":21,"level":22,"text":27},"Evolution of the National Transport Fund and impact of inflation",{"type":29,"head":30,"rows":38,"numeric":89,"rowHeads":90,"title":91,"caption":92},"table",[31,32,33,34,35,36,37],"Years","2021","2022","2023","2024","2025","Sum",[39,47,55,62,68,74,82],[40,41,42,43,44,45,46],"FNT","4,870,877","4,971,843","5,054,129","5,153,821","5,346,545","",[48,49,50,51,52,53,54],"FNT increase","\u002F","2.10%","1.70%","2.00%","3.70%","9.50%",[56,49,57,58,59,60,61],"Inflation (F.O.I.)","8.10%","5.40%","0.80%","1.10%","15.40%",[63,41,64,65,66,67,46],"Cumulative FNT","9,842,720","14,896,849","20,050,670","25,397,215",[69,41,70,71,72,73,46],"FNT adjusted to the F.O.I. index","5,265,418","5,549,751","5,594,149","5,655,684",[75,76,77,78,79,80,81],"Annual difference","0","-293,575","-495,622","-440,328","-309,139","-1,538,664",[83,49,84,85,86,87,88],"Annual difference %","-6.03%","-9.41%","-7.93%","-5.53%","-28.90%",[7,7,90,90,90,90,90],true,"Evolution of the National Transport Fund and impact of inflation (thousands of euros)","Figures in thousands of euros · Basco&amp;T Consulting elaboration on data Istat and \u003Ca href=\"https:\u002F\u002Fwww.mef.gov.it\u002F\">Ministero dell’Economia e delle Finanze\u003C\u002Fa>",{"type":18,"html":94},"\u003Cp>Analysis of FNT trends for the period 2021–2025 shows steady nominal growth: from 4.87 billion in 2021 to 5.35 billion in 2025. However, this trend does not offset the price increases recorded in the sector over the same period.\u003C\u002Fp>\n",{"type":96,"ordered":7,"icon":97,"items":98},"list",null,[99,100],"The overall increase in the FNT over the five-year period is \u003Cstrong>+9,5%\u003C\u002Fstrong>.","Cumulative inflation in the transport sector reaches \u003Cstrong>+15,4%\u003C\u002Fstrong>.",{"type":18,"html":102},"\u003Cp>This results in a gradual deterioration of the Fund's purchasing power. Each year, the FNT grows less than inflation, leading to a growing gap between available resources and actual costs.\u003C\u002Fp>\n",{"type":18,"html":104},"\u003Cp>The inflation-adjusted FNT represents the value that the Fund would have had to reach in order to maintain its purchasing power unchanged.\nExample:\u003C\u002Fp>\n",{"type":96,"ordered":7,"icon":97,"items":106},[107,108,109],"In 2023, the actual FNT amounts to €5,054,129.","But the amount needed to cover inflation would have been €5,549,751.","The deviation is over €495,000 (-9.4%).",{"type":18,"html":111},"\u003Cp>The cumulative result for the last five years is a total loss of €1.5 billion, compared to the amount needed to fully cover inflation over the five-year period.\u003C\u002Fp>\n",{"type":18,"html":113},"\u003Cp>This gap represents a structural problem, as the FNT is the main source of funding for local public transport.\u003C\u002Fp>\n",{"type":21,"level":22,"text":115},"The context: stagnant wages and frozen contracts",{"type":18,"html":117},"\u003Cp>In addition to the unfavorable dynamics of the FNT, there is also the effect of delays in contract renewals over the last twenty years, which have resulted in:\u003C\u002Fp>\n",{"type":96,"ordered":7,"icon":97,"items":119},[120,121,122],"Salary stagnation","loss of purchasing power for workers","need for more resources to clear the backlog when renewals are unblocked",{"type":18,"html":124},"\u003Cp>\u003Cstrong>These resources must necessarily be obtained through a structural adjustment of the FNT.\u003C\u002Fstrong>\u003C\u002Fp>\n",{"type":21,"level":22,"text":126},"Requests from trade associations",{"type":18,"html":128},"\u003Cp>The trade associations Agens, ANAV, and Asstra are calling for:\u003C\u002Fp>\n",{"type":96,"ordered":90,"icon":97,"items":130},[131,132,133,134,135],"\u003Cstrong>Structural adjustment of the FNT to sector inflation\u003C\u002Fstrong>","\u003Cstrong>Automatic indexing of the Fundx\u003C\u002Fstrong>","\u003Cstrong>Recognition of the costs of ecological transition\u003C\u002Fstrong>","\u003Cstrong>Additional resources for contract renewals and staffing requirements\u003C\u002Fstrong>","\u003Cstrong>Multi-year stability in financing\u003C\u002Fstrong>",{"type":18,"html":137},"\u003Cp>Without immediate intervention, there is a risk of the system becoming increasingly fragile: fewer journeys, difficulties in planning investments, and increasingly critical working conditions.\u003C\u002Fp>\n",{"type":21,"level":22,"text":139},"Conclusion",{"type":18,"html":141},"\u003Cp>The analysis clearly shows that the National Transport Fund has not kept pace with inflation in recent years and has lost real value. Without urgent action, the public transport system risks becoming unsustainable, with effects such as:\u003C\u002Fp>\n",{"type":96,"ordered":7,"icon":97,"items":143},[144,145,146,147],"significant reduction in the resources available to public transport companies,","slowdown in vehicle renewals and ecological transition,","difficulties in managing staff and contracts,","compromise in service quality and continuity.",{"type":18,"html":149},"\u003Cp>Structural and immediate intervention on the FNT is therefore essential to ensure the stability and future of local public transport.\u003C\u002Fp>\n","\u002Fapi\u002Fassets\u002Fd5a05b84-2c89-4c21-ad40-07494546a72a",[152],{"thumb":153,"large":14,"full":150,"alt":13},"\u002Fapi\u002Fassets\u002Fd5a05b84-2c89-4c21-ad40-07494546a72a?width=200&format=webp",{"title":97,"description":97,"image":97,"noindex":7},"en",[157,167,177],{"slug":158,"date":159,"theme":6,"featured":7,"title":160,"abstract":161,"cover":162,"coverAlt":163,"infographic":164,"infographicAlt":165,"infographicLarge":166,"infographicCount":15},"tpl-lombardia-lazio","2026-06-18","LPT and territorial disparities: Italy’s two-speed system reflected in the tenders issued by Milan and the Lazio region","An analytical comparison of fares, mileage and investment reveals a marked imbalance between funding in the North and that in the Centre and South for local public road transport. The analysis of the structural and economic state of Local Public Transport (LPT) in Italy compares two of the most significant tendering procedures of recent years: the tender issued by the Milan, Monza and Brianza, Lodi and Pavia basin, and the Lazio Region’s combined urban and extra-urban tender managed by Astral S.p.A. The data analysed reveal a clear and unequivocal divide in terms of the public resources allocated. The data examined show a clear and unequivocal divide in terms of public resources allocated. While the Milan basinallocates €1.248 billion for a 7-year contract, ensuring a weighted average compensation of €4.17 per km (rising to €4.46 per km when including over €86 million in capital contributions exclusively intended for fleet renewal), the Lazio Region has tendered a total value of €630.5 million spread over 9 years, corresponding to a weighted average compensation of just €2.33 per km, with no structural funding flows for vehicle fleets integrated into the base contract. Beyond the purely financial gap, a deep difference also emerges in the efficiency and administrative fluidity of the two procedures (in Lazio, the tender published in 2023 has yet to complete its awarding process), confirming the existence of territorial asymmetries that disadvantage Central and Southern Italy.","\u002Fapi\u002Fassets\u002Fcd91d059-329e-475e-be48-2ff8924344ec?width=800&format=webp","Mobility Metrics cover: side-by-side maps of the public transport tenders for the Milan basin (7-year contract, 5 lots) and the Lazio region (9 years, 11 lots, only 7 awarded)","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=500&format=webp","Infographic, Milan vs Lazio: weighted average fee of €4.17\u002Fkm against €2.33\u002Fkm, base tender value of €1.248bn against €630.5m, and no capital funding for new buses in Lazio","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=1000&format=webp",{"slug":168,"date":169,"theme":6,"featured":7,"title":170,"abstract":171,"cover":172,"coverAlt":173,"infographic":174,"infographicAlt":175,"infographicLarge":176,"infographicCount":15},"tpl-lombardia-como-lecco-e-varese","2026-05-06","Lombardia LPT: Como, Lecco and Varese head toward tender","The new tender for local public transport in the Como–Lecco–Varese catchment area represents one of the most significant steps in the reorganisation of local public transport in Lombardy. The Catchment Area Programme provides for a total of approximately 31.68 million vehicle-kilometres per year, divided into five territorial lots: Como and the Lake, Brianza Comasca, Lecco, Varese and the Valleys, and the Varese area. Added to these is the ‘Cable Car Lot’, already awarded in 2024. Economic estimates point to a total figure of approximately €71.03 million in tender fees and €21.31 million in expected fare revenue, for a total estimated value of around €92.33 million per year. The estimated average fee is €2.24\u002Fkm, whilst average fare revenue accounts for approximately €0.67\u002Fkm, bringing the average total economic value to approximately €2.92\u002Fkm. The catchment area has a complex industrial structure: 1,343 employees in total as at 31 December 2024, of whom 1,234 are to be transferred to the new operators; a requirement for 857 buses, of which 516 are classified as essential and 215 are to be procured from scratch; and a network of 44 depots, some of which are considered essential for the continuity of the service.","\u002Fapi\u002Fassets\u002Fed0efaa6-b23d-441e-8c51-9c1ac4eee67a?width=800&format=webp","Mobility Metrics cover: map of the five lots in the Como-Lecco-Varese public transport tender (Como and Lake, Brianza Comasca, Lecco, Varese and Valleys, Varesotto), over 31.6 million vehicle-km a year","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=500&format=webp","Infographic on the Como-Lecco-Varese tender: 5 lots, 31.7 million km a year (22.3 million interurban), €71 million annual compensation, 1,343 staff and 857 vehicles required","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=1000&format=webp",{"slug":178,"date":179,"theme":6,"featured":7,"title":180,"abstract":181,"cover":182,"coverAlt":183,"infographic":184,"infographicAlt":185,"infographicLarge":186,"infographicCount":15},"tpl-lombardia-2026-gare","2026-05-04","Lombardia LPT 2026: the \"tender of tenders\"","Lombardia’s local public transport (TPL) system is heading toward a structural transformation by 2026, with the phase-out of old concessions and the introduction of a more integrated and controlled model. The system is organized into 6 Basin Agencies: the largest, Milan, Monza and Brianza, Lodi, and Pavia, covers four provinces and manages about 160 million bus-km per year, while the others cover provincial or multi-provincial areas with different territorial characteristics (mountainous, urban, or suburban).","\u002Fapi\u002Fassets\u002Fbbf8a83a-6913-4fd1-acf5-d8ecf99dfe35?width=800&format=webp","Mobility Metrics cover: map of Lombardy divided into its 6 public transport basin agencies, showing the number of lots planned for each 2026 tender","\u002Fapi\u002Fassets\u002Fbd4ff53d-f6c8-44f7-9561-b8ee95c6fd55?width=500&format=webp","Infographic on Lombardy's 2026 public transport tenders by basin: 271.8 million km a year and €665.9m in compensation; Milan-Monza-Lodi-Pavia is the largest at 158 million km and €4.14\u002Fkm","\u002Fapi\u002Fassets\u002Fbd4ff53d-f6c8-44f7-9561-b8ee95c6fd55?width=1000&format=webp"]